Pre-delivery Inspection
Pre-delivery inspection of manufactured goods of the SSI
units in the State is undertaken when it is stipulated in the schedule of rate contract
and is requested for by the Indenting Officer. It is also undertaken on the request
of the purchaser, against rate contract items, even if the same is not mentioned
in the rate contract schedule.
(i) When PDI for an item is provided in the schedule of rate contract by the Directorate
of Export Promotion & Marketing, it will be the duty of the supplier to inform the
DD(I) in a proforma vide annexure-‘C’ specifying the date and number of samples
ready for inspection against a particular order. The intimation letter should reach
the DD(I) at least fifteen ays before the date stipulated for making delivery.
(ii)The Inspecting Officer deputed for conducting PDI should take with him the marking
tools such as acceptance/rejection stamps, lead seals, pliers, rubber stamps, stencils
etc, supplied by the Directorate for marking of stores ‘Accepted’ or ‘Rejected’
as the case may be. He is responsible for safe custody of the materials, including
seals, and also for misuse.
(iii)The Inspecting Officer will carry out the inspection according to the relevant
standards laid down or special scheme of inspection out-lined by the Director, EP&M,
if any for the products. In case of doubt with regard to the quality or where complaints
against quality were lodged on previous occasions, the Inspecting Officers(s) drawn
the sample(s) and sends the same to the nearest testing laboratory, if testing facilities
are available there, to carry out tests.
In such cases the store items are marked “Acceptedâ€Â, after receipt of satisfactory
test results from the Laboratory.
(iv)After the inspection is completed in all respects, the Inspecting Officer prepares
the report of pre-delivery inspection of accepted goods in the form vide “Annexure-Dâ€Â
in triplicate and submits them in the Directorate out of which two copies of the
report will be issued from the directorate to the supplier for dispatch of the materials
to the consignee. The third copy of the report is kept in the relevant file. No
inspection report is handed over to the party in his factory premises without approval
of the same by the Director and it is issued only from the Directorate.
(v)Separate Inspection Reports are made for each order. All Steel, metal and wooden
materials accepted are given a punch mark. Other materials are given stencil marks
or seals as the case may be. Articles too small are bundled/packed and then stamped
or sealed. The bundling or packing of the materials should not be interfered with
after sealing.
(vi)The supplier is fully responsible for dispatching the goods with the inspection
report to the Indenting officer, who may, in turn verify/check the goods according
to the Inspection report and inform the DD(I) of Directorate of EP&M within seven
days of receipt of the consignment with an acknowledgement that the goods received
are in good condition and satisfactory.
(vii)The ultimate responsibility for accepting the quality of goods, however, rests
with the Indenting Officer. In case any consignment is found not upto the mark or
upto the quality prescribed by the Indenting Officer, it is to be segregated and
a report should be sent to the Directorate immediately under intimation to the supplier.
If no complaint is received within seven days from the date of receipt of the consignment
along with the Inspection report, it is to be presumed that the goods are accepted
by the purchaser, in no case, complaint will be entertained after seven days of
delivery of goods and the purchaser is bound to accept the same.
(viii)The Inspecting Officer are for bidder to make any subsequent modification
in the specifications, designs or drawings then earlier furnished by the supplier.
Ordinarily, the ISI Specifications are to be followed. Where no standards have been
prescribed by the ISI the Director, in consultation with the concerned departments/Users/manufacturers
may prepare specifications.
1.7 Procedure for drawal of samples: Mode of drawal of samples –
(i) Sample (s) can be drawn by the Inspecting Officer of the Directorate of Export
Promotion and Marketing. The District Industries Centres of the State may also draw
sample(s) as authorized by Government in Industries department letter No.136(13)/I(EPM)
dated the 24th November 1978. the sample is to be drawn for the store items, strictly
in accordance with the recommendation of the Indian standard Specifications. The
samples are to be sealed and signed, both by the Inspecting Officer and the respective
manufacturer from whom the sample is drawn.
(ii)The quantity of sample(s) to be drawn has been indicated in column-4 of the
schedule of Testing charge as at Annexure-‘G’, and also is mentioned in the relevant
I.S.Specification.
(iii)All samples, meant for test in the Testing Laboratory should be properly packed
so as to avoid damage in transit.
(iv)In case of samples which are quite heavy and unwieldy and it is difficult to
transport the same to the laboratory, the Inspecting Officer may make performance
test of the sample at premises of the manufacturer and submit his report, provided
required testing facility is available with the unit.